update on 209

Okay , this picture shows where the 2 front doors are. Hubby doesn't have the 2 front porches on this but they are at the front doors. The door in the green room is the back door. We will be installing the French doors in the yellow room(kitchen) and then the deck by the end of summer if not sooner.The area on the front of the house were the double windows are do not have a porch.

The deadline we have given ourselves to be moved completely to 209 is Sept 6th. Our landlord doesn't care if we go pass that date and as long as we give him 30 days notice of us being completely out he is fine.That's the date were we will start stressing of making double payments of rent and mortgage. Can you tell we have done this before?

We have changed the laundry room(green room) to be in the closet (top left sliver mist room) and we will put Baby (7cf chest freezer) in the mudroom which is what we are calling the green room ...the colors of the rooms will be flipped to the closet being lime green and the mudroom silver mist. I plan to put a door in the closet where the window is because the clothes line is right there in a couple years.. You can barely see the top of the window in this layout in that room. I would rather have my laundry in the closet where I can immediately put clothes away than at the door where everyone comes in and out. Also it's easier to clean the dryer vent with it in the closet as it will go directly through the wall of the house and NOT through the crawl space and thourgh the foundation.Less chance of wind freezing pipes also due to air from vent coming in.

Our mortgage guy, Rex called Friday morning and asked us to connect with contractor,Charlie and finalize the items for the house. Rex is at step 4 which needs the final bids. This is about 3 weeks ahead of schedule.

Got a hold of Charlie,our contractor, who was stressing a little until I made it clear that  we understood he probably wouldn't be able to start early but we had things we could to that would help him like remove the line closet where the bathroom door needs to be widened and remove the shelves where the wheelchair shower will be.SO we are meeting this week to finalize the items to keep the FHA loan moving along. The more we pay cash for, the less we will owe on the loan so the less we will pay in interest.

ON the frugal side, we bought part of the general paint supplies, the track lighting for over the kitchen sink, a double shower rod for the orange bathroom, a 3 arm rack for the kitchen sink dish cloths, 2 entry rugs for the porches, 4 new exterior door hands with dead bolts to put on AFTER the work is done and a Keysafe so we don't have to be there to let workers in at Menards with 11% rebate.

I have bookmarked items on sale at Home Depot that  I want as soon as we meet with Charlie to make sure he can't get them cheaper as that sale goes off first part of March so I will order them if I need to.

We started pulling items we have stored from houses we have lived in so we are "saving" the money
So far we have found for the kitchen... 8 light chandelier (actually I have it hanging above me right now as we took down the ceiling fan that was there) saving $217.80 and a 3 light hanging pot rack savings $398.99. We have found a wooden medicine cabinet for orange bathroom saving$44.98 and a white medicine cabinet (needs a bit of work of fixing door to stay shut) saving $39.99 for WC bath (WC stands for wheelchair). Add the 7.5 % tax we pay that's a savings of $1,070.44

The only piece of furniture I know for sure we will be buying is a recliner  for Hubby.

I will continue to shop Habitat for Restore, Goodwill and auctions. I wished it was yardsale season LOL

Blessed Be