Saturday, May 26, 2018

209 update



Head construction company guy *head contractor* told me end of May the house would be finished... The he got informed by the carpenter that wasn't going to happen and the carpenter had him come down and see why not...

I am glad I wasn't there when the butt kicking started.

Last week I let Head contractor know that once again the same crew that he kicked butt was not showing up and it was really causing problems and SLOWING down the drywall crew.

Twenty four hours later crew was in, forty eight hours later we had this:

Yeah Hubby is drinking from an old garden hose. Then I did... didn't even taste like garden hose and oh yeah we both know that taste.
and then we got the hand pump to the cistern working, not tasting that water...will need to have cistern pumped out and clean and rain spouting that doesn't let the birds play in it before we use it.

hot water heater is on wall, not fully installed as it is gas. There is also the plumbing for the regular bathroom and tub/shower combo frame in started...



bath/shower pic 1st, toilet drain hole 2nd and sink drain hole 3rd

and also


My kitchen sink drain and plumbing. While Carpenter was waiting for this stuff to be done... he walked around and was checking the work that had been done and found these 2 sections of roof that was missed (including by us) and let the company know to send the roofers back.


Then he started installing the storm doors. He got 2 out of the 3 done.
Hubby borrowed the disk from the Amish neighbor  and finished working the south garden



This has the strawberries ...you can barely see the edge of them in the upper left had corner...this garden is 120 ft long and 40 ft wide... We will be cutting it back to 80 ft long and 40 ft wide.  I would like to move the rhubarb into this area also instead of the middle of the yard. The other side where the asparagus is is 100 ft by 50 ft. We will be turning this to grass except where the asparagus is. Too many tree roots in the dirt.

Hubby was there this mowing while waiting for the truck to deliver the deck stuff we ordered. Said he got it pretty much done, probably because he didn't have anyone stopping him to get answers LOL.

We have a big pow wow with the Head Contractor on Tuesday afternoon so I am hoping the work continues as it has the last 3 days.